FT-12FGMN20 12mm flat gear motor with long lead screw
Product Description
These specifications determine the motor's output speed, torque, and power consumption. Some models may also offer features such as encoders or brakes for enhanced control and safety.These motors find applications in robotics, automation equipment, medical devices, automotive systems, and more. They are often chosen for their compact size, durability, and ability to provide precise and reliable motion control in space-constrained environments.Overall, flat DC gear motors are a versatile and efficient solution for applications that require high torque and precise control of speed and motion.
Application
Flat geared motors are widely used in the field of industrial automation. Some common applications include:
Mechanical equipment: square geared motors can be used in various mechanical equipment, such as conveyor belts, assembly lines, packaging equipment, etc., by controlling the speed and steering of square geared motors, precise motion control can be achieved.
Robot: The square geared motor can be used in the joint or drive system of the robot to provide stable rotational force and control the range of motion and speed of the robot.
Automation equipment: square geared motors are widely used in various automation equipment, such as automatic doors, vending machines, automatic lifts, etc., through the rotation of square geared motors to realize the opening, closing or position adjustment of the equipment.
Medical equipment: square geared motors can be used in medical equipment, such as surgical robots, medical equipment, etc., to achieve the accuracy and stability of medical operations by controlling the movement of square geared motors.
In short, the application of square geared motors is very wide, covering almost all fields of automation and mechanical equipment.
Company Profile
![FT-36PGM545-555-595-3650_12](http://www.fortogearmotor.com/uploads/FT-36PGM545-555-595-3650_12.jpg)
![FT-36PGM545-555-595-3650_13](http://www.fortogearmotor.com/uploads/FT-36PGM545-555-595-3650_13.jpg)
![FT-36PGM545-555-595-3650_11](http://www.fortogearmotor.com/uploads/FT-36PGM545-555-595-3650_11.jpg)
![FT-36PGM545-555-595-3650_09](http://www.fortogearmotor.com/uploads/FT-36PGM545-555-595-3650_09.jpg)